Half of every flocculant problem we are asked to solve is a method problem: the jar test was run wrong, the dose was converted wrong, or the polymer was chosen by price. These are the methods we use ourselves — published so you can check our work.

01 — Method

How to run
a jar test properly.

Six doses, two mixing speeds, one settling time. The version below is the one that correlates with plant performance; the ten-minute version does not.

Procedure

01Use the real water, fresh. One litre per jar, taken at the point where the chemical will be dosed, used within two hours. Settled or filtered water is not the same water.
02Measure before you dose. Turbidity, pH, alkalinity, temperature and suspended solids. Without these the result cannot be reproduced next month.
03Run the coagulant ladder first. Six jars, doses spanning 0 to 2× your estimate, rapid mix 200 rpm for 2 minutes.
04Then the flocculant ladder, on the winning coagulant dose. Six polymer doses at 40 rpm for 15 minutes. Add polymer below the surface, not onto it.
05Settle 30 minutes without stirring. Record turbidity at 5, 10, 20 and 30 minutes — the settling curve tells you more than the final number.
06Repeat the winner once. If it does not reproduce, the test is telling you the water is variable, which is also useful.

Five ways a jar test lies to you

Too much shear. A stirrer at 400 rpm during flocculation breaks the floc the polymer just built. Use 40 rpm and a paddle, not a bar.

Polymer added as powder. Powder dropped into a jar never dissolves properly. Always dose from a 0.1–0.3% stock solution.

Wrong order. Coagulant then polymer, with 30–90 seconds between them. Reversing the order gives a result that cannot be reproduced in the plant.

Temperature. A jar test at 22 °C does not predict a plant at 8 °C in winter. Note the temperature and expect a higher dose in the cold.

Judging by eye. “Clearer” is not a measurement. Turbidity in NTU, or settled volume in mL/L, or CST in seconds — pick one and record it.

02 — Arithmetic

The conversions
every plant needs.

Most quoting errors are unit errors. These are the four that matter, and they are exact.

ConversionFormulaWorked example
mg/L → g/m³1 mg/L = 1 g/m³ (density 1.0)60 mg/L = 60 g/m³ = 60 kg per 1,000 m³
Dose → daily consumptionkg/day = dose (g/m³) × flow (m³/d) ÷ 1,00060 g/m³ × 10,000 m³/d = 600 kg/day
Daily → bags / containersbags = kg/day ÷ bag weight600 kg ÷ 25 kg = 24 bags/day
Product ↔ active contentactual dose = theoretical × standard % ÷ actual %30% basis at 28% product: ×30 ÷ 29 = +3.4% on dose
Sludge dose basiskg/t DS = polymer (kg/h) ÷ (sludge (m³/h) × DS% × 1 t/m³)40 kg/h ÷ (100 m³/h × 2%) = 20 kg/t DS
The last row is the one people get wrong: sludge dose is always quoted per tonne of dry solids, never per cubic metre of wet sludge. Convert with the dry-solids figure from the lab, not the design figure.
03 — Selection

Which of the three
polymer families?

Charge first, molecular weight second, pH and salinity as tie-breakers.

SituationFamilyWhyGrade
Mineral tailings, coal, sand wash waterAnionicSolids are negative; PAC destabilises first, then the chain bridgesA1210 / A1610
Biological sludge, DAF float, paper retentionCationicOrganic colloids are negative but need charge neutralisation as well as bridgingC10 / C30 / C50
pH below 5, or above 3% saltNon-ionicCarboxylate groups protonate at low pH; hydrogen bonding is unaffected by saltN06 / N10
Drinking waterPAC 29% + DW-grade anionicOnly potable-approved grades; NSF required in the USPAC-29 / A1210-DW
Colour and dye removalPAC + cationic C80High charge density flocculates the dye-colloid complexPAC-28 + C80
High-solid tailings, oil sandsAnionic, high MWBridging length dominates when the bed has to be compressedA2010
If two families look plausible, the tie-breaker is pH and hardness, not price. A cheap anionic grade in acid water is the most expensive polymer in the plant, because none of it works.
04 — Cost

PAC against alum,
on total cost.

The invoice price is the smallest part of the comparison. Alkalinity, pH correction, sludge volume and dose all move.

Alum is cheaper per tonne and more expensive per cubic metre. The gap is alkalinity: every mg/L of alum consumes about 0.45 mg/L of alkalinity as CaCO₃, which someone has to replace with lime.

PAC is pre-hydrolysed, so it consumes roughly half the alkalinity of alum for the same coagulation job, works across a wider pH band, and forms a denser floc that settles faster. On low-alkalinity water the advantage is large enough that PAC wins on delivered cost even at twice the price per tonne.

Where alum still wins: high-alkalinity water, low colour, and plants that already have alum handling infrastructure and no lime dosing.

Cost lineAlumPAC 28%
Dose for 30 NTU removal40–80 g/m³20–50 g/m³
Alkalinity consumed~0.45 mg per mg~0.20 mg per mg
pH correction neededOftenRarely
Sludge volumeHigher10–25% lower
Low-temperature performancePoor below 10 °CMaintains
Figures are typical ranges from plant practice, not a guaranteed comparison. A jar test on your water, with your alkalinity, settles it in an afternoon.
05 — Documents

Technical data
for each grade.

TDS and SDS are issued per grade, because the numbers differ between grades of the same product family.

Polymers
Anionic PAM TDSA1010 / A1210 / A1610 / A2010
Open
Cationic PAM TDSC10 / C30 / C50 / C80
Open
Non-ionic PAM TDSN04 / N06 / N08 / N10
Open
Coagulants
PAC 28% industrial TDSGB/T 22627-2022, three forms
Open
PAC 29% drinking water TDSGB 15892, hygiene licence
Open
SDS and COAIssued per batch — request by grade
Request
06 — Questions

About these guides.

Can I reproduce these guides in a tender document?

Yes, with attribution. The jar-test method and dose conversions are standard practice, not proprietary — we publish them because a buyer who understands the method writes a better specification.

Do you provide MSDS/SDS in other languages?

English as standard; Spanish, Portuguese, Russian and Vietnamese on request for contract volumes. The SDS format follows GHS, so it can be re-labelled for local regulation by your importer.

Why publish this instead of keeping it for sales calls?

Because the plants that call us have usually already tried something that did not work. If they arrive knowing how to run a jar test, the first conversation is about their water rather than about our product.

Next step

Want the method run
on your own water?

Send a 2-litre sample and the operating data. We run the jar test in our lab and return the curves, the recommended grade and a dose range — free for qualified projects.

Reply within 12 working hours · data used for quotation only