The program,
not the product.
A coagulant without the right flocculant leaves a stable, pin-floc suspension. A flocculant without a coagulant cannot adsorb at all. Buying them as a program is how a plant ends up with one dosing sequence, one jar test and one party responsible for the result.
Four steps,
in this order.
The order is not a preference. Reverse any two and the dose rises or the result disappears.
Mixing energy figures are velocity gradients (G, s⁻¹). A plant without a G value can estimate it from impeller diameter and speed, or simply observe: if the floc is visible at the paddle but gone at the weir, the flocculation stage is too violent.
Starting ratios
by application.
Ratios are the fastest way to sanity-check a quotation. If a supplier proposes 5:1 PAC:PAM on municipal sewage, one of the two doses is wrong.
| Application | PAC dose | PAM dose | Ratio (PAC:PAM) | Which PAM |
|---|---|---|---|---|
| Municipal sewage | 20–80 g/m³ | 0.5–3 g/m³ | 20–60 : 1 | Anionic |
| Industrial wastewater | 50–300 g/m³ | 1–6 g/m³ | 40–80 : 1 | Anionic |
| Textile dyeing effluent | 80–400 g/m³ | 4–15 g/m³ | 25–60 : 1 | Cationic C80 |
| Drinking water | 10–60 g/m³ | 0.2–1 g/m³ | 50–100 : 1 | Anionic, DW grade |
| Paper retention | 2–8 kg/t | 0.2–1.0 kg/t | 10–20 : 1 | Cationic C10/C30 |
| Sludge conditioning | 30–80 kg/t DS | 2–6 kg/t DS | 10–25 : 1 | Cationic C50 |
| Mining tailings | 30–150 g/t | 20–80 g/t | 2–6 : 1 | Anionic A1210/A1610 |
Four weeks
to a settled dose.
The plan below is what we propose to plants that have never run a jar test properly, or that have inherited a dose nobody can explain.
Week 1 — Baseline
Sample the water or slurry at the dosing point, log the current chemicals and doses, and record what the plant is actually achieving (turbidity, TSS, cake solids, colour). Without a baseline, every later claim is an opinion.
Week 2 — Jar test
Coagulant ladder, then flocculant ladder on the winning coagulant dose. Settling curves and turbidity recorded at each point. We send the report, including the doses that lost.
Week 3 — Plant trial
Run the recommended pair at the jar-test dose for a full week, at constant flow where possible. Watch the dosing pump calibration — a 10% error here is larger than the difference between grades.
Week 4 — Lock and document
Fix the dose, the dilution, the injection points and the mixing speeds in the operating procedure. Re-test seasonally: the optimum moves with water temperature and solids.
A worked example,
not a quotation.
10,000 m³/d of industrial wastewater, 300 mg/L influent solids, 30 mg/L target. Prices are indicative export levels.
Inputs
Result
Freight, labour, make-down power and sludge disposal are excluded — together they usually exceed the chemical cost. Use this as the floor of the budget, not the budget.
About the program.
Why buy both from one supplier?
Because the dosing sequence is where most of the performance lives. When PAC and PAM come from two suppliers, neither will own the question of whether the coagulant is underdosed — and the polymer gets blamed. One supplier, one jar test, one recommendation.
Do I have to commit to an annual contract?
No. Most plants start with a trial container of each product (20–25 t), then move to scheduled shipments. Annual contracts get price protection and a reserved production slot, which matters more than the discount when a plant has a fixed maintenance window.
What if my plant only needs one of the two?
Then buy one. A plant with clean, coarse, high-hardness tailings often runs anionic PAM alone; a plant with low-turbidity water may need only PAC. We will tell you which case you are in after the jar test.
How is the ratio set?
By jar test, then confirmed in plant. Typical starting ratios are 20–60:1 PAC:PAM by weight for wastewater, and 2–6:1 for sludge conditioning where PAC is used as a conditioner. The ratio moves with solids and alkalinity, so it is re-checked seasonally.
Can you supply the dosing equipment?
We supply the chemicals and the dosing specification — pump rates, dilution, injection points and mixing energies. Equipment itself is sourced locally by the plant or its contractor, and we will review the proposal against the chemistry.
Send the water.
Get the pair and the ratio.
Flow, solids, pH, alkalinity and the target. We reply with a coagulant grade, a flocculant grade, the starting ratio and a jar-test plan.