Home/Applications/Municipal water
Drinking water · sewage · sludge

Municipal water: two businesses,
one set of chemistries.

A drinking-water plant is judged on filtered-water turbidity and residual aluminium; a sewage plant is judged on phosphorus, TSS and the cost of dewatering sludge. The chemicals overlap, the specifications do not — and mixing them up is a compliance problem, not a commercial one.

<0.1 NTUFILTERED WATER
<0.5 mg/LTOTAL PHOSPHORUS
20–25%CAKE SOLIDS
GB 15892POTABLE GRADE
What goes into this water
PAC 29% drinking waterCoagulation for potable supply, under a hygiene licence for potable contact.10–60 g/m³
PAC 28% industrialSewage coagulation, phosphorus removal, sludge conditioning.20–80 g/m³
Cationic PAM C30 / C50Sludge dewatering on belt press, centrifuge and plate press.2–5 kg/t DS
Anionic PAM (DW grade on request)Flocculation where a polymer is permitted — ≤0.025% monomer for potable duty.0.2–1 ppm
01 — Water profile

Six figures from
the plant log.

Utilities have the best operating data of any customer group and the least time to analyse it. These are the six numbers that decide the coagulant dose and the sludge grade.

ParameterTypical rangeWhy it matters
Raw water turbidity1–500 NTUBelow 10 NTU charge neutralisation dominates; above 50 NTU sweep floc dominates
Alkalinity30–250 mg/L as CaCO₃Below 40 mg/L, PAC needs a lime supplement or the floc never forms properly
pH6.5–8.5Outside 6.5–8.0 residual aluminium climbs even at the right dose
Colour / NOM5–80 Pt-CoColour consumes coagulant before turbidity does, and it is a THM precursor
Sludge dry solids0.5–4%Sets the polymer dose per tonne and whether a centrifuge or a press is economic
Effluent phosphorus limit0.3–1.0 mg/LMetal-salt dose for P removal is stoichiometric, not jar-test optimised
For potable supply we also need the regulator's specification. If it names NSF/ANSI 60 we will say up front that we cannot meet it — see the compliance section on the PAC 29% page.
02 — Treatment train

Two trains, one supply chain.

Drinking water and sewage use the same unit operations in a different order and with different specifications.

INTAKERaw waterRiver, reservoir or borehole. Turbidity and alkalinity logged daily.—
COAGULATIONPAC 29%Rapid mix 30–60 s at G 300–500 s⁻¹. Dose set by jar test.10–60 g/m³
FLOCCULATIONPolymer (optional)Gentle mix 15–20 min at G 30–60 s⁻¹, where a polymer is permitted.0.2–1 ppm
CLARIFICATIONSettlement / DAFSludge blanket or dissolved air flotation for algal water.—
FILTRATIONSand / UFThe step that proves the dose was right: <0.1 NTU.—
DISINFECTIONChlorine / UVResidual Al below 0.2 mg/L before this point.—

On the sewage side the same coagulant sits before primary settlement or in the tertiary stage for phosphorus, and the cationic polymer sits on the sludge line. Two different dosages, one product family.

03 — Recommended program

Specified by the permit,
not by the price list.

Potable duty and sludge duty are separate specifications with separate documents.

What a utility usually needs. Two grades of PAC and one grade of cationic PAM, plus a documented jar-test protocol for the potable plant. We supply the protocol and the batch COA template so the operating record stands up to inspection.

04 — Dose reference

Dose reference.

Potable doses are set by jar test; the figures below are the range in which that test usually lands.

DutyProductDoseTarget
Surface water coagulationPAC 29%10–60 g/m³Filtered water < 0.1 NTU, Al < 0.2 mg/L
Low-turbidity / algal waterPAC-29 LG5–30 g/m³Filter runs > 24 h
Sewage primary / tertiaryPAC 28%20–80 g/m³TP < 0.5 mg/L, TSS < 20 mg/L
Sludge dewatering — belt pressCationic C302–4 kg/t DSCake 20–25% DS
Sludge dewatering — centrifugeCationic C503–6 kg/t DSCake 22–28% DS, capture > 95%
Sludge conditioning — plate pressCationic C50 + PAC4–8 kg/t DS + 30–80 kg/t DSCake 30–38% DS
Phosphorus removal is stoichiometric: roughly 1.5–3 parts PAC per part of phosphorus to be removed, depending on the metal content and the competing alkalinity. A jar test will confirm it but the chemistry sets the floor.
05 — What goes wrong

What inspectors find.

Four issues that show up in operating records more often than in textbooks.

Residual aluminium above limit

Almost always a dose or pH problem, not a product problem. Check pH first (target 6.5–8.0), then cut the dose 10% and re-test. Al climbing while turbidity is fine is the classic overdose signature.

Filter runs getting shorter

Either the coagulant is underdosed so fine floc passes, or the grade carries too many insolubles for the raw water. Low-turbidity and algal water need the low-insoluble grade.

Cake solids below design

Usually polymer-related: wrong charge density for the sludge, overdosing, or shear between injection and the press. Check the dose ladder before blaming the machine.

Grade substitution under price pressure

Industrial PAC in a potable plant is a compliance failure waiting for an audit. The two grades are not interchangeable and the paperwork proves it.

What good looks like. Filtered water below 0.1 NTU, residual aluminium below 0.2 mg/L, cake at 22–25% DS from a belt press, and a jar-test record that matches the actual dose on the log sheet. Those four together pass an inspection; three of them do not.
<0.1 NTUFiltered water
<0.2 mg/LResidual aluminium
<0.5 mg/LTotal phosphorus
20–28%Cake solids
06 — Questions from plant engineers

Before you write the specification.

Do you hold NSF/ANSI 60?

No. We hold a Chinese hygiene licence and produce to GB 15892. If your specification requires NSF/ANSI 60, our PAC 29% does not meet it and we will say so before quoting rather than after delivery.

Can we use the industrial grade in an emergency?

No, and we will not supply it for that purpose. The heavy-metal and insolubles limits are different by design. If a potable plant is short of product, the answer is an emergency purchase of a compliant grade, not a substitution.

What documents come with a potable shipment?

Batch COA with the full heavy-metal panel, SDS, hygiene licence copy, packing list and certificate of origin. Consular legalisation can be arranged where customs requires it.

How do we set the dose?

Jar test: six doses, 2 min rapid mix at 200 rpm, 15 min slow mix at 40 rpm, 30 min settlement. Measure turbidity and pH at each point and confirm the winner against filtered-water turbidity. We supply the protocol as a one-page method.

Can you help with sludge dewatering trials?

Yes. Send 2–5 L of sludge with the dry solids figure and the machine type; we return a dose ladder with CST or SRF results and a recommended charge density. The test is free for utilities evaluating a switch.

Next step

Send the water quality.
Get a compliant dose.

Raw water or effluent analysis, plant flow and your regulator's specification. For potable duty we reply with the batch COA and licence copy alongside the quotation.

Reply within 12 working hours · data used for quotation only

Talk to us